The highest quality for your traffic: already more than 200 bicycle bridges installed

Fietsbrug Hoeveniersweg, Roosendaal

FiberCore Europe is the world´s expert manufacturer of fibre-reinforced load-bearing structures for both architecture and infrastructure.



How to prevent delamination in your FRP structures?

Fibercore Europe - good bridges last long

Foundation and installation advantages with our extremely light bridges

Spoorlaan

FiberCore Europe is the world´s expert manufacturer of fibre-reinforced load-bearing structures for both architecture and infrastructure.



How to prevent delamination in your FRP structures?

Fibercore Europe - good bridges last long

The strongest bridges easy to fit into your infrastructure

Maarssenseweg

FiberCore Europe is the world´s expert manufacturer of fibre-reinforced load-bearing structures for both architecture and infrastructure.



How to prevent delamination in your FRP structures?

Fibercore Europe - good bridges last long

Lock gates that can withstand the water for centuries.

Lock gate

FiberCore Europe is the world´s expert manufacturer of fibre-reinforced load-bearing structures for both architecture and infrastructure.



How to prevent delamination in your FRP structures?

Fibercore Europe - lock gates without maintenance

Constructions in all sizes, also in combination with tradidional construction materials

Viaduct over highway

FiberCore Europe is the world´s expert manufacturer of fibre-reinforced load-bearing structures for both architecture and infrastructure.



How to prevent delamination in your FRP structures?

Fibercore Europe - good bridges last long

Frontpage Slideshow | Copyright © 2006-2011 JoomlaWorks Ltd.

Hybrid solution and concrete for renovation

hybrid-solution-and-concrete-for-renovation     SUREbridge has proven that the load-bearing capacity of existing concrete bridges can be increased factor a factor of 2.5. This has...
[line]

25th harbour bridge installed in Rotterdam

25th-harbour-bridge-installed-in-rotterdam           In the port of Rotterdam the 25th harbour bridge with InfraCore®Inside was installed early October. Together with...
[line]

Testimonials

  "This is the first InfraCore bridge we’ve installed. And we’re looking to do many more in the future." mr-jamie-wesley-ecsMr. Jamie Wesley - ECS