…resolved this with the installation of a new guide on one side of the brook. Once complete, the crane lifted the new FRP stoplog into position and we confirmed a…
…for a crane lift. The bridge deck was delivered to site complete with surfacing in February 2017 along with the parapet. The installation contractor was able to quickly lift the…
…the bridge to be lifted into position using tracked mechanical excavators. FRP footbridge being lifted into position at Bird Ridding The FRP bridge deck was lifted into place and the…
…piece complete with surfacing and handrails and was lifted into position in under an hour. After installation Lifespan Structuresremoved the adjacent timber bridge and completed the surfacing and hand railing…
…compared to the steel footbridge option. The parapets are 1.4m high galvanized steel and powder coated. The bridges are designed with a longitudinal camber to improve the visual aesthetics and…
…100 year flood level. Fast installation of the lightweight structure minimised disruption to users of the park. The existing abutments were reutilised, with only simple modifications to allow for the…