FiberCore Europe - Public Space Trade Fair 2022

Save the date!
September 5 and 6 - Jaarbeurs Utrecht

On Wednesday 5 and Thursday 6 September 2021, Jaarbeurs Utrecht will again be completely dedicated to public space. This year is the seventeenth edition of the largest event for design, layout, maintenance and management of our living environment. Over 600 exhibitors will show their latest products or services. Including FiberCore Europe!

Visit our booth!

Visit the FiberCore team at booth number 3.6.12. We will be happy to inform you about our sustainable composite solutions and about our innovative solutions for bridge renovation, including the innovative SUREbridge method. Want to schedule an appointment? Contact your FiberCore sales advisor, or our sales department at 010 - 476 58 58 or email info@fibercore-europe.com.

Admission is free

Admission to the fair is free. However, registration is a requirement. This can be done on the website of the trade fair. The fair will take place in Hall 2, 3 and 4 of Jaarbeurs Utrecht and is open both days from 9.00 am to 17.00 pm.

Bridge renovation? Do it sustainably with composite!

Is a bridge in dire need of renovation? Wooden and steel bridge decks require a lot of maintenance and need to be replaced at the end of their useful life. Wooden decks can rot and allow liquids and de-icing salts to penetrate, which can damage the underlying steel structure. With a composite FiberCore bridge deck with InfraCoreĀ® Inside, these obstacles are a thing of the past.

Efficient renovation of concrete bridges: SUREbridge

SUREbridge offers the solution for fast, sustainable and cost-effective renovation of concrete bridges. The existing structure is strengthened and - if desired - widened by installing a prefabricated composite panel slide-proof on top. This allows the bridge to last up to 50 years again, with minimal maintenance. By applying the method, the bridge is strengthened by a factor of 2 to 2.5, in a construction time of only 6 weeks. And because the structure does not have to be demolished, this results in savings in time, inconvenience and transport; a major environmental benefit. Costs are also saved; up to 50% compared to demolition and new construction. After applying the SUREbridge method, the bridge is once again completely future-proof!