Assendelft | Watergouw


  • Project Number: 17-264
  • Length: 8.7 & 11.3m
  • Width: 4.5 & 1.5m
  • Class: Eurocodes and 5kN/m2
  • Year built: 2018

Up, up, and away! For client Duss Projecten and Sallandse Wegenbouw, Griekspoor hoisted these two FiberCore composite bridges high through the air to their final destination in the new construction district of Watergouw in Assendelft. The light weight of the bridges allowed the crane to reach further and minimized inconvenience to local residents. It concerns a traffic class bridge and a bicycle/pedestrian bridge.