Belgium | Mol | Sunparks Kempense Meren
- Project number: 19-420
- Class: 5kN/m2
- Year of construction: 2020
'Like a fish in water' is this bridge at a special location at Sunparks Kempense Meren in Mol, Belgium. As a building material, composite is particularly suitable for the subtropical, humid climate that prevails in the swimming paradise of this vacation park. Thus, the bridge is easy and quick to install and resistant to external influences (no rust or corrosion).
The bridge was installed overnight, allowing visitors to use both the pool and the bridge immediately the next day.