Delfgauw | Spui
- Project number: 17-296
- Length: 8m
- Width: 3.5m
- Class: Eurocodes
- Year built: 2018
Hard-to-reach construction site? FiberCore Europe composite traffic bridges are lightweight and therefore easy and quick to install with minimal resources. See here the placement of an 8 x 3.5 meter composite traffic bridge on the Spui in Delfgauw, commissioned by Schouten Bouw & Ontwikkeling and in collaboration with GKB Realisatie B.V.