Haarlem | Schalkwijkerstraat
- Project Number: 11-026
- Length: 13.2 & 15m
- Width: 9.5 & 7.4m
- Class: 5kN/m2 + service vehicle
- Year built: 2012
These two bridges, equipped with a special traditional railing, were installed in 2012 to replace two weathered wooden bridges. Due to the railing and pre-formed bridge deck with footpath, the modern bridge still fits perfectly into the old Haarlem city center.
The South Bicycle Bridge has a trapezoidal shape, but is nevertheless prefabricated and composed of two parts in a clever way.
Both bridges are equipped with provisions for the piping of public utilities. Among these is a main gas transmission pipeline with a diameter of no less than 600mm. The facilities were created behind and under the overhanging edge so that the pipes, despite their size, are not conspicuous.