Maastricht | Belvédere | Noordbrugtracé


  • Project number: 18-334
  • Length: 21.7m
  • Width: 4.5m
  • Class: 5kN/m2 + service vehicle
  • Year built: 2018

Early in the morning, together with Strukton, we placed this composite prefabricated bicycle bridge with InfraCore® Inside technology in the Noordbrugtracé in the Municipality of Maastricht. Artwork H is the pedestrian and bicycle bridge connecting Bosscherweg with the Lage Fronten and the Noorderbrug bicycle path.

In this item from Infra360, Struktons Mark de Vries explains the choice of a composite bridge from FiberCore Europe: