Maastricht | Belvédere | Noordbrugtracé
- Project number: 18-334
- Length: 21.7m
- Width: 4.5m
- Class: 5kN/m2 + service vehicle
- Year built: 2018
Early in the morning, together with Strukton, we placed this composite prefabricated bicycle bridge with InfraCore® Inside technology in the Noordbrugtracé in the Municipality of Maastricht. Artwork H is the pedestrian and bicycle bridge connecting Bosscherweg with the Lage Fronten and the Noorderbrug bicycle path.
In this item from Infra360, Struktons Mark de Vries explains the choice of a composite bridge from FiberCore Europe: