Voorhout | Railroad Viaduct
- Project number: 18-390
- Length: 16.6m
- Width: 6.4m
- Class: 5kn/m2 + service vehicle
- Year of construction: 2020
- Client: Municipality of Teylingen
- In cooperation with: Heijmans | Westdijk Transport
As part of the Noordelijke Randweg Voorhout underpass, an uncommon bicycle bridge was installed. This unusually shaped FiberCore bridge with InfraCoreĀ® Inside with striking semicircular edge detailing is a lot lighter than a bridge in traditional materialization. This limits the permanent load on the existing substructure. Moreover, the Municipality of Teylingen had expressed a preference for a composite bridge in the context of sustainability and low maintenance costs. The 6.5 meter wide bridge was The 6.5-meter-wide bridge was transported as one part in an overnight transport and placed in a time frame of less than one hour. This limited the number of transport movements, as well as the associated number of transport movements as well as the associated environmental nuisance.